Jump to content
BW Advert Drive

Safra - MF, TPY, Tampines, Yishun, Jurong, PG & CCK (Compiled)


Recommended Posts

Guest mrjuicetiger
Posted (edited)

🙂

Edited by mrjuicetiger
Posted
On 12/23/2022 at 12:54 PM, boyboy24 said:

My frd sent me de. I busy till no time to go. 😆 but safra tpy is more happening. 😆 

what time is best for safra tpy?  day/ nights/ weekends?

Guest mrjuicetiger
Posted (edited)

.

Edited by mrjuicetiger
.
Posted
2 hours ago, Johan said:

Venue: Tampines Safra Swimming Complex

Date: 1 Jan 2023

Time: Noon

 

Dude, if you get to read this. Thank you for your towel. I cannot imagine how long I have to blow dry myself with the weak hairdryer.

 

Happy New Year!

 

That guy must be really sweet. 😍

Posted
2 hours ago, Johan said:

Venue: Tampines Safra Swimming Complex

Date: 1 Jan 2023

Time: Noon

 

Dude, if you get to read this. Thank you for your towel. I cannot imagine how long I have to blow dry myself with the weak hairdryer.

 

Happy New Year!

 

 

That's such a nice and thoughtful gesture. Hope u guys exchange contacts and catch up again. 

Posted

Heads-up: for the steam room users/lovers, the one at TPY outlet is down again, barely a week after it resumed. For info eh.

 

Happy - is what we should be, always.

 

Notice: I DO NOT use the Chat Function in this Forum - this has always been written in my profile (and I don't read it too).

{it is unfortunate that this new Chat Function does not allow users to turn/switch off in mobile phone}

 

Posted

Met u today at tpy safra Jacuzzi around 9 pm, we were touching each other until someone came in. We smiled and waved goodbye in the changing room. Msg me if you are here :)

Posted

Today (16/01/23) from around 6pm to 7pm at Yishun EnergyOne.

 

You were in a beige shirt and black shorts and wearing a black high cut converse. 
 

Not sure if it is intentional, but our eyes met many times. Make a friend?

Posted

Half of the toilet / changing rooms in SAFRA Tampines is closed (once again) for retiling of floor. The affected areas include half of the larger changing area and the longer stretch of shower cubicles. Ironically, this means many will shower at that "strategic location", but with the drilling (no pun intended) and workers talking, this may be bad news to the cruisers... The expected period of renovation works is 18 to 31 January 2022.

Posted
12 hours ago, JYAG-sim said:

Half of the toilet / changing rooms in SAFRA Tampines is closed (once again) for retiling of floor. The affected areas include half of the larger changing area and the longer stretch of shower cubicles. Ironically, this means many will shower at that "strategic location", but with the drilling (no pun intended) and workers talking, this may be bad news to the cruisers... The expected period of renovation works is 18 to 31 January 2022.

You are referring to the gym or pool toilet?

Guest mrjuicetiger
Posted (edited)

🙃

Edited by mrjuicetiger

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...