Jump to content
Male HQ

Safra - MF, Yishun, Tampines, Jurong, PG & TP (Compiled)


Recommended Posts

Half of the toilet / changing rooms in SAFRA Tampines is closed (once again) for retiling of floor. The affected areas include half of the larger changing area and the longer stretch of shower cubicles. Ironically, this means many will shower at that "strategic location", but with the drilling (no pun intended) and workers talking, this may be bad news to the cruisers... The expected period of renovation works is 18 to 31 January 2022.

Link to comment
12 hours ago, JYAG-sim said:

Half of the toilet / changing rooms in SAFRA Tampines is closed (once again) for retiling of floor. The affected areas include half of the larger changing area and the longer stretch of shower cubicles. Ironically, this means many will shower at that "strategic location", but with the drilling (no pun intended) and workers talking, this may be bad news to the cruisers... The expected period of renovation works is 18 to 31 January 2022.

You are referring to the gym or pool toilet?

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...